Palisades Road over Drainage Nacimiento Riv
FairMonterey County, California · NW Oak Flat Sec 27 · Structure no. DAPFORLIG000758
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected October 2023
- Type
- Truss - Thru
- Steel
- Length
- 60 ft
- 1 main span
- Daily traffic
- 1
- 2021 count
- Owner
- Federal
- Army
About this bridge
Palisades Road over Drainage Nacimiento Riv is a steel truss - thru carrying Palisades Road over Drainage Nacimiento Riv in Monterey County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1 vehicles a day, roughly 1% of them trucks, projected to reach 2 by 2045. The structure is 60 ft (18.3 m) long and 18 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Palisades Road over Drainage Nacimiento Riv built?
It was built in 2012, making it 13 years old in 2025.
What condition is Palisades Road over Drainage Nacimiento Riv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Palisades Road over Drainage Nacimiento Riv carry?
About 1 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Palisades Road over Drainage Nacimiento Riv?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 18 ft wide.
Who owns Palisades Road over Drainage Nacimiento Riv?
It is owned by the Army.