US Bridges

Nacimento Lake DR over San Antonio River

Good

Monterey County, California · 5 MI South of US 101 · Structure no. 44C0206

Built
2023
2 years old
Condition
Good
inspected February 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
269 ft
2 main spans
Daily traffic
530
2016 count
Owner
County
County Highway Agency

About this bridge

Nacimento Lake DR over San Antonio River is a prestressed concrete continuous box beam or girders - multiple carrying Nacimento Lake DR over San Antonio River in Monterey County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 530 vehicles a day, roughly 5% of them trucks, projected to reach 628 by 2045. The structure is 269 ft (82.1 m) long and 34 ft wide. If it were closed, the detour would be 44.1 mi (71 km).

CarriesNacimento Lake DR
CrossesSan Antonio River
Location5 MI South of US 101
RouteCounty Highway 0
Coordinates35.80839, -120.8553
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length269 ft (82.1 m)
Longest span145 ft (44.2 m)
Deck width34 ft (10.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic530 (2016)
Projected traffic628 by 2045
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed44.1 mi (71 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nacimento Lake DR over San Antonio River built?

It was built in 2023, making it 2 years old in 2025.

What condition is Nacimento Lake DR over San Antonio River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Nacimento Lake DR over San Antonio River carry?

About 530 vehicles per day (2016 count), of which roughly 5% are trucks.

How long is Nacimento Lake DR over San Antonio River?

The structure is 269 ft (82.1 m) long with a longest span of 145 ft (44.2 m) and a deck 34 ft wide.

Who owns Nacimento Lake DR over San Antonio River?

It is owned by the County Highway Agency.