Peach Tree Road over San Lorenzo Creek
GoodMonterey County, California · 5.5 MI W Slack Canyon RD · Structure no. 44C0152
- Built
- 1966
- 59 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 20
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Peach Tree Road over San Lorenzo Creek is a concrete stringer/multi-beam or girder carrying Peach Tree Road over San Lorenzo Creek in Monterey County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 3% of them trucks, projected to reach 51 by 2041. The structure is 26 ft (7.9 m) long and 30 ft wide. If it were closed, the detour would be 62.1 mi (100 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peach Tree Road over San Lorenzo Creek built?
It was built in 1966, making it 59 years old in 2025.
What condition is Peach Tree Road over San Lorenzo Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Peach Tree Road over San Lorenzo Creek carry?
About 20 vehicles per day (2015 count), of which roughly 3% are trucks.
How long is Peach Tree Road over San Lorenzo Creek?
The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.5 m) and a deck 30 ft wide.
Who owns Peach Tree Road over San Lorenzo Creek?
It is owned by the County Highway Agency.