US Bridges

Porter DR over Pajaro River

Good

Monterey County, California · 0.05 MI N San Juan RD · Structure no. 44C0055

Built
1998
27 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
446 ft
4 main spans
Daily traffic
26,900
2017 count
Owner
County
County Highway Agency

About this bridge

Porter DR over Pajaro River is a prestressed concrete continuous box beam or girders - multiple carrying Porter DR over Pajaro River in Monterey County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,900 vehicles a day, roughly 10% of them trucks, projected to reach 42,048 by 2040. The structure is 446 ft (135.9 m) long and 88 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesPorter DR
CrossesPajaro River
Location0.05 MI N San Juan RD
RouteCounty Highway 0
Coordinates36.90485, -121.75062
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length446 ft (135.9 m)
Longest span116 ft (35.5 m)
Deck width88 ft (26.8 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,900 (2017)
Projected traffic42,048 by 2040
Trucks10%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Porter DR over Pajaro River built?

It was built in 1998, making it 27 years old in 2025.

What condition is Porter DR over Pajaro River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Porter DR over Pajaro River carry?

About 26,900 vehicles per day (2017 count), of which roughly 10% are trucks.

How long is Porter DR over Pajaro River?

The structure is 446 ft (135.9 m) long with a longest span of 116 ft (35.5 m) and a deck 88 ft wide.

Who owns Porter DR over Pajaro River?

It is owned by the County Highway Agency.