US Bridges

San Miguel Canyon over U.S. Highway 101

Fair

Monterey County, California · 05-MON-101-96.14 · Structure no. 44 0271

Built
2004
21 years old, rebuilt 2012
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
193 ft
2 main spans
Daily traffic
11,900
2009 count
Owner
State
State Highway Agency

About this bridge

San Miguel Canyon over U.S. Highway 101 is a prestressed concrete continuous box beam or girders - multiple carrying San Miguel Canyon over U.S. Highway 101 in Monterey County, California. It was built in 2004 and reconstructed in 2012, so it is 21 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,900 vehicles a day, roughly 5% of them trucks, projected to reach 36,522 by 2042. The structure is 193 ft (58.9 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSan Miguel Canyon
CrossesU.S. Highway 101
Location05-MON-101-96.14
RouteU.S. Route 101
Coordinates36.79952, -121.66444
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length193 ft (58.9 m)
Longest span110 ft (33.4 m)
Deck width54 ft (16.6 m)
Roadway width52 ft (15.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,900 (2009)
Projected traffic36,522 by 2042
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was San Miguel Canyon over U.S. Highway 101 built?

It was built in 2004, making it 21 years old in 2025. It was reconstructed in 2012.

What condition is San Miguel Canyon over U.S. Highway 101 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does San Miguel Canyon over U.S. Highway 101 carry?

About 11,900 vehicles per day (2009 count), of which roughly 5% are trucks.

How long is San Miguel Canyon over U.S. Highway 101?

The structure is 193 ft (58.9 m) long with a longest span of 110 ft (33.4 m) and a deck 54 ft wide.

Who owns San Miguel Canyon over U.S. Highway 101?

It is owned by the State Highway Agency.