Kowolski Road over Clear Lake Dam Spillway
GoodModoc County, California · 40 MI SE of Klamath Falls · Structure no. KLAM-001
- Built
- 1999
- 26 years old, rebuilt 2001
- Condition
- Good
- inspected January 2021
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 101 ft
- 1 main span
- Daily traffic
- 1
- 2007 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
Kowolski Road over Clear Lake Dam Spillway is a prestressed concrete box beam or girders - multiple carrying Kowolski Road over Clear Lake Dam Spillway in Modoc County, California. It was built in 1999 and reconstructed in 2001, so it is 26 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1 vehicles a day, projected to reach 1 by 2037. The structure is 101 ft (30.8 m) long and 16 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Kowolski Road over Clear Lake Dam Spillway built?
It was built in 1999, making it 26 years old in 2025. It was reconstructed in 2001.
What condition is Kowolski Road over Clear Lake Dam Spillway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2021.
How much traffic does Kowolski Road over Clear Lake Dam Spillway carry?
About 1 vehicles per day (2007 count).
How long is Kowolski Road over Clear Lake Dam Spillway?
The structure is 101 ft (30.8 m) long with a longest span of 99 ft (30.3 m) and a deck 16 ft wide.
Who owns Kowolski Road over Clear Lake Dam Spillway?
It is owned by the Bureau of Reclamation.