CR 64/JESS Valley over South Fork Pit River
FairModoc County, California · 3.5 MI E S.R. 395 · Structure no. 03C0045
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 63 ft
- 1 main span
- Daily traffic
- 315
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
CR 64/JESS Valley over South Fork Pit River is a wood or timber stringer/multi-beam or girder carrying CR 64/JESS Valley over South Fork Pit River in Modoc County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 315 vehicles a day, roughly 6% of them trucks, projected to reach 367 by 2041. The structure is 63 ft (19.1 m) long and 26 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 64/JESS Valley over South Fork Pit River built?
It was built in 1972, making it 53 years old in 2025.
What condition is CR 64/JESS Valley over South Fork Pit River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does CR 64/JESS Valley over South Fork Pit River carry?
About 315 vehicles per day (2010 count), of which roughly 6% are trucks.
How long is CR 64/JESS Valley over South Fork Pit River?
The structure is 63 ft (19.1 m) long with a longest span of 61 ft (18.6 m) and a deck 26 ft wide.
Who owns CR 64/JESS Valley over South Fork Pit River?
It is owned by the County Highway Agency.