Center Avenue over Ccid Main Canal
FairMerced County, California · 0.4 MI South of SR 152 · Structure no. 39C0333
- Built
- 1948
- 77 years old, rebuilt 1968
- Condition
- Fair
- inspected February 2025
- Type
- Slab
- Concrete Continuous
- Length
- 45 ft
- 3 main spans
- Daily traffic
- 4,087
- 2006 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Center Avenue over Ccid Main Canal is a concrete continuous slab carrying Center Avenue over Ccid Main Canal in Merced County, California. It was built in 1948 and reconstructed in 1968, so it is 77 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,087 vehicles a day, roughly 1% of them trucks, projected to reach 10,590 by 2045. The structure is 45 ft (13.7 m) long and 53 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center Avenue over Ccid Main Canal built?
It was built in 1948, making it 77 years old in 2025. It was reconstructed in 1968.
What condition is Center Avenue over Ccid Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Center Avenue over Ccid Main Canal carry?
About 4,087 vehicles per day (2006 count), of which roughly 1% are trucks.
How long is Center Avenue over Ccid Main Canal?
The structure is 45 ft (13.7 m) long with a longest span of 16 ft (4.9 m) and a deck 53 ft wide.
Who owns Center Avenue over Ccid Main Canal?
It is owned by the City or Municipal Highway Agency.