US Bridges

Yamato Way over Livingston Canal

Fair

Merced County, California · At Eucalyptus Ave · Structure no. 39C0137

Built
1960
65 years old, rebuilt 2022
Condition
Fair
inspected January 2024
Type
Slab
Concrete Continuous
Length
42 ft
2 main spans
Daily traffic
40
2008 count
Owner
County
County Highway Agency

About this bridge

Yamato Way over Livingston Canal is a concrete continuous slab carrying Yamato Way over Livingston Canal in Merced County, California. It was built in 1960 and reconstructed in 2022, so it is 65 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 40 vehicles a day, roughly 2% of them trucks, projected to reach 71 by 2042. The structure is 42 ft (12.8 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesYamato Way
CrossesLivingston Canal
LocationAt Eucalyptus Ave
RouteCounty Highway 0
Coordinates37.40368, -120.69523
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length42 ft (12.8 m)
Longest span20 ft (6.1 m)
Deck width27 ft (8.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2008)
Projected traffic71 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Yamato Way over Livingston Canal built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2022.

What condition is Yamato Way over Livingston Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Yamato Way over Livingston Canal carry?

About 40 vehicles per day (2008 count), of which roughly 2% are trucks.

How long is Yamato Way over Livingston Canal?

The structure is 42 ft (12.8 m) long with a longest span of 20 ft (6.1 m) and a deck 27 ft wide.

Who owns Yamato Way over Livingston Canal?

It is owned by the County Highway Agency.