Hinton Avenue over High Line Canal
FairMerced County, California · 0.3 MI S of Bloss Ave · Structure no. 39C0127
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 610
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Hinton Avenue over High Line Canal is a concrete continuous slab carrying Hinton Avenue over High Line Canal in Merced County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 610 vehicles a day, roughly 7% of them trucks, projected to reach 711 by 2042. The structure is 24 ft (7.3 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hinton Avenue over High Line Canal built?
It was built in 1940, making it 85 years old in 2025.
What condition is Hinton Avenue over High Line Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Hinton Avenue over High Line Canal carry?
About 610 vehicles per day (2014 count), of which roughly 7% are trucks.
How long is Hinton Avenue over High Line Canal?
The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.6 m) and a deck 25 ft wide.
Who owns Hinton Avenue over High Line Canal?
It is owned by the County Highway Agency.