Hornitos Road over F. P. Creek
FairMerced County, California · 2.3 MI SE Merced Falls RD · Structure no. 39C0069
- Built
- 1971
- 54 years old, rebuilt 2002
- Condition
- Fair
- inspected January 2025
- Type
- Slab
- Concrete Continuous
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 300
- 1990 count
- Owner
- County
- County Highway Agency
About this bridge
Hornitos Road over F. P. Creek is a concrete continuous slab carrying Hornitos Road over F. P. Creek in Merced County, California. It was built in 1971 and reconstructed in 2002, so it is 54 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 300 vehicles a day, roughly 3% of them trucks, projected to reach 1,113 by 2047. The structure is 24 ft (7.3 m) long and 28 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hornitos Road over F. P. Creek built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2002.
What condition is Hornitos Road over F. P. Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Hornitos Road over F. P. Creek carry?
About 300 vehicles per day (1990 count), of which roughly 3% are trucks.
How long is Hornitos Road over F. P. Creek?
The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.5 m) and a deck 28 ft wide.
Who owns Hornitos Road over F. P. Creek?
It is owned by the County Highway Agency.