Forest Road 200 over Chamberlain Creek
GoodMendocino County, California · 1.0 MI N JCT SR 20 · Structure no. 10F0013
- Built
- 1958
- 67 years old, rebuilt 2021
- Condition
- Good
- inspected May 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 75
- 2009 count
- Owner
- State
- State Park, Forest, or Reservation Agency
About this bridge
Forest Road 200 over Chamberlain Creek is a prestressed concrete slab carrying Forest Road 200 over Chamberlain Creek in Mendocino County, California. It was built in 1958 and reconstructed in 2021, so it is 67 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, projected to reach 98 by 2041. The structure is 31 ft (9.6 m) long and 16 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Forest Road 200 over Chamberlain Creek built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2021.
What condition is Forest Road 200 over Chamberlain Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Forest Road 200 over Chamberlain Creek carry?
About 75 vehicles per day (2009 count).
How long is Forest Road 200 over Chamberlain Creek?
The structure is 31 ft (9.6 m) long with a longest span of 27 ft (8.2 m) and a deck 16 ft wide.
Who owns Forest Road 200 over Chamberlain Creek?
It is owned by the State Park, Forest, or Reservation Agency.