Fish Rock RD over Rancheria Creek
FairMendocino County, California · 0.05 MI W SH 128 · Structure no. 10C0105
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 163 ft
- 2 main spans
- Daily traffic
- 429
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Fish Rock RD over Rancheria Creek is a concrete continuous box beam or girders - multiple carrying Fish Rock RD over Rancheria Creek in Mendocino County, California. It was built in 1978, so it is 47 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 429 vehicles a day, roughly 6% of them trucks, projected to reach 384 by 2042. The structure is 163 ft (49.6 m) long and 32 ft wide. If it were closed, the detour would be 70.2 mi (113 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fish Rock RD over Rancheria Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is Fish Rock RD over Rancheria Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Fish Rock RD over Rancheria Creek carry?
About 429 vehicles per day (2011 count), of which roughly 6% are trucks.
How long is Fish Rock RD over Rancheria Creek?
The structure is 163 ft (49.6 m) long with a longest span of 80 ft (24.4 m) and a deck 32 ft wide.
Who owns Fish Rock RD over Rancheria Creek?
It is owned by the County Highway Agency.