US Bridges

US Highway 101 SB over ST RTE 20 (@ Pm 33.22)

Fair

Mendocino County, California · 01-MEN-101-30.82 · Structure no. 10 0205L

Built
1962
63 years old
Condition
Fair
inspected June 2024
Type
Tee Beam
Concrete Continuous
Length
172 ft
3 main spans
Daily traffic
12,300
2009 count
Owner
State
State Highway Agency

About this bridge

US Highway 101 SB over ST RTE 20 (@ Pm 33.22) is a concrete continuous tee beam carrying US Highway 101 SB over ST RTE 20 (@ Pm 33.22) in Mendocino County, California. It was built in 1962, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,300 vehicles a day, roughly 11% of them trucks, projected to reach 22,597 by 2042. The structure is 172 ft (52.4 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS Highway 101 SB
CrossesST RTE 20 (@ Pm 33.22)
Location01-MEN-101-30.82
RouteU.S. Route 101
Coordinates39.23962, -123.20759
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length172 ft (52.4 m)
Longest span71 ft (21.6 m)
Deck width40 ft (12.1 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,300 (2009)
Projected traffic22,597 by 2042
Trucks11%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US Highway 101 SB over ST RTE 20 (@ Pm 33.22) built?

It was built in 1962, making it 63 years old in 2025.

What condition is US Highway 101 SB over ST RTE 20 (@ Pm 33.22) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does US Highway 101 SB over ST RTE 20 (@ Pm 33.22) carry?

About 12,300 vehicles per day (2009 count), of which roughly 11% are trucks.

How long is US Highway 101 SB over ST RTE 20 (@ Pm 33.22)?

The structure is 172 ft (52.4 m) long with a longest span of 71 ft (21.6 m) and a deck 40 ft wide.

Who owns US Highway 101 SB over ST RTE 20 (@ Pm 33.22)?

It is owned by the State Highway Agency.