US Bridges

El Portal Road over Lower Cascade Creek over

Fair

Mariposa County, California · 5.0 Miles East from El Po · Structure no. 8800012P0000000

Built
2000
25 years old
Condition
Fair
inspected September 2024
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
2,080
2022 count
Owner
Federal
National Park Service

About this bridge

El Portal Road over Lower Cascade Creek over is a concrete culvert carrying El Portal Road over Lower Cascade Creek over in Mariposa County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,080 vehicles a day, roughly 1% of them trucks, projected to reach 2,496 by 2042. The structure is 26 ft (7.8 m) long and 43 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesEl Portal Road
CrossesLower Cascade Creek over
Location5.0 Miles East from El Po
RouteFederal Lands Road 16
Coordinates37.72347, -119.71294
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length26 ft (7.8 m)
Longest span12 ft (3.6 m)
Deck width43 ft (13 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,080 (2022)
Projected traffic2,496 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerNational Park Service
Maintained byNational Park Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$81,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was El Portal Road over Lower Cascade Creek over built?

It was built in 2000, making it 25 years old in 2025.

What condition is El Portal Road over Lower Cascade Creek over in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does El Portal Road over Lower Cascade Creek over carry?

About 2,080 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is El Portal Road over Lower Cascade Creek over?

The structure is 26 ft (7.8 m) long with a longest span of 12 ft (3.6 m) and a deck 43 ft wide.

Who owns El Portal Road over Lower Cascade Creek over?

It is owned by the National Park Service.