US Bridges

Sentinel Bridge Ro over Merced River

Fair

Mariposa County, California · 13.2 Miles East from El P · Structure no. 8800004P0000000

Built
1994
31 years old
Condition
Fair
inspected September 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
116 ft
1 main span
Daily traffic
3,416
2022 count
Owner
Federal
National Park Service

About this bridge

Sentinel Bridge Ro over Merced River is a prestressed concrete box beam or girders - single or spread carrying Sentinel Bridge Ro over Merced River in Mariposa County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,416 vehicles a day, roughly 1% of them trucks, projected to reach 4,099 by 2042. The structure is 116 ft (35.4 m) long and 48 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSentinel Bridge Ro
CrossesMerced River
Location13.2 Miles East from El P
RouteFederal Lands Road 12
Coordinates37.74339, -119.5897
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length116 ft (35.4 m)
Longest span113 ft (34.4 m)
Deck width48 ft (14.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,416 (2022)
Projected traffic4,099 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerNational Park Service
Maintained byNational Park Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sentinel Bridge Ro over Merced River built?

It was built in 1994, making it 31 years old in 2025.

What condition is Sentinel Bridge Ro over Merced River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Sentinel Bridge Ro over Merced River carry?

About 3,416 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Sentinel Bridge Ro over Merced River?

The structure is 116 ft (35.4 m) long with a longest span of 113 ft (34.4 m) and a deck 48 ft wide.

Who owns Sentinel Bridge Ro over Merced River?

It is owned by the National Park Service.