Summit Ave over Hillside
FairMarin County, California · 1.4 MI Intrx Lovell Ave · Structure no. 27C0052
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected July 2023
- Type
- Slab
- Wood or Timber
- Length
- 72 ft
- 4 main spans
- Daily traffic
- 257
- 2004 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Summit Ave over Hillside is a wood or timber slab carrying Summit Ave over Hillside in Marin County, California. It was built in 1980, so it is 45 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 257 vehicles a day, roughly 3% of them trucks, projected to reach 436 by 2041. The structure is 72 ft (21.9 m) long and 18 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Summit Ave over Hillside built?
It was built in 1980, making it 45 years old in 2025.
What condition is Summit Ave over Hillside in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Summit Ave over Hillside carry?
About 257 vehicles per day (2004 count), of which roughly 3% are trucks.
How long is Summit Ave over Hillside?
The structure is 72 ft (21.9 m) long with a longest span of 18 ft (5.4 m) and a deck 18 ft wide.
Who owns Summit Ave over Hillside?
It is owned by the City or Municipal Highway Agency.