Pt Reyes Petlma RD over Nicasio Creek
FairMarin County, California · 3.2 MI E of SR 1 · Structure no. 27C0035
- Built
- 1937
- 88 years old
- Condition
- Fair
- inspected August 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 6,000
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Pt Reyes Petlma RD over Nicasio Creek is a concrete continuous tee beam carrying Pt Reyes Petlma RD over Nicasio Creek in Marin County, California. It was built in 1937, so it is 88 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,000 vehicles a day, roughly 10% of them trucks, projected to reach 8,905 by 2045. The structure is 102 ft (31.1 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pt Reyes Petlma RD over Nicasio Creek built?
It was built in 1937, making it 88 years old in 2025.
What condition is Pt Reyes Petlma RD over Nicasio Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Pt Reyes Petlma RD over Nicasio Creek carry?
About 6,000 vehicles per day (2012 count), of which roughly 10% are trucks.
How long is Pt Reyes Petlma RD over Nicasio Creek?
The structure is 102 ft (31.1 m) long with a longest span of 34 ft (10.4 m) and a deck 28 ft wide.
Who owns Pt Reyes Petlma RD over Nicasio Creek?
It is owned by the County Highway Agency.