S Novato Blvd over W37-S101 Connector Ramp
FairMarin County, California · 04-MRN-101-18.94-NVTO · Structure no. 27 0086K
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 160 ft
- 3 main spans
- Daily traffic
- 12,500
- 1998 count
- Owner
- State
- State Highway Agency
About this bridge
S Novato Blvd over W37-S101 Connector Ramp is a concrete continuous box beam or girders - multiple carrying S Novato Blvd over W37-S101 Connector Ramp in Marin County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,500 vehicles a day, roughly 7% of them trucks, projected to reach 17,330 by 2041. The structure is 160 ft (48.8 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Novato Blvd over W37-S101 Connector Ramp built?
It was built in 1964, making it 61 years old in 2025.
What condition is S Novato Blvd over W37-S101 Connector Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does S Novato Blvd over W37-S101 Connector Ramp carry?
About 12,500 vehicles per day (1998 count), of which roughly 7% are trucks.
How long is S Novato Blvd over W37-S101 Connector Ramp?
The structure is 160 ft (48.8 m) long with a longest span of 66 ft (20.1 m) and a deck 26 ft wide.
Who owns S Novato Blvd over W37-S101 Connector Ramp?
It is owned by the State Highway Agency.