US Bridges

Avenue 18.5 over Eastside Bypass Channel

PoorClosed to traffic

Madera County, California · 2.0 MI East of Road 4 · Structure no. 41C0089

Built
1965
60 years old
Condition
Poor
inspected March 2023
Type
Slab
Concrete Continuous
Length
318 ft
11 main spans
Daily traffic
300
2020 count
Owner
County
County Highway Agency

About this bridge

Avenue 18.5 over Eastside Bypass Channel is a concrete continuous slab carrying Avenue 18.5 over Eastside Bypass Channel in Madera County, California. It was built in 1965, so it is 60 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.

It carries about 300 vehicles a day, roughly 12% of them trucks, projected to reach 655 by 2041. The structure is 318 ft (96.9 m) long and 31 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesAvenue 18.5
CrossesEastside Bypass Channel
Location2.0 MI East of Road 4
RouteCounty Highway 0
Coordinates37.01817, -120.43425
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Channel and channel protection3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans11
Design loadHS 20
Structure length318 ft (96.9 m)
Longest span30 ft (9.1 m)
Deck width31 ft (9.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2020)
Projected traffic655 by 2041
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$3.5 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Avenue 18.5 over Eastside Bypass Channel built?

It was built in 1965, making it 60 years old in 2025.

What condition is Avenue 18.5 over Eastside Bypass Channel in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2023.

How much traffic does Avenue 18.5 over Eastside Bypass Channel carry?

About 300 vehicles per day (2020 count), of which roughly 12% are trucks.

How long is Avenue 18.5 over Eastside Bypass Channel?

The structure is 318 ft (96.9 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.

Who owns Avenue 18.5 over Eastside Bypass Channel?

It is owned by the County Highway Agency.