Chowchilla Blvd over Ash Slough
FairMadera County, California · 0.2 MI N Robertson Blvd · Structure no. 41C0042
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 227 ft
- 8 main spans
- Daily traffic
- 1,900
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Chowchilla Blvd over Ash Slough is a concrete continuous slab carrying Chowchilla Blvd over Ash Slough in Madera County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,900 vehicles a day, roughly 7% of them trucks, projected to reach 6,608 by 2041. The structure is 227 ft (69.2 m) long and 41 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chowchilla Blvd over Ash Slough built?
It was built in 1988, making it 37 years old in 2025.
What condition is Chowchilla Blvd over Ash Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Chowchilla Blvd over Ash Slough carry?
About 1,900 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Chowchilla Blvd over Ash Slough?
The structure is 227 ft (69.2 m) long with a longest span of 28 ft (8.6 m) and a deck 41 ft wide.
Who owns Chowchilla Blvd over Ash Slough?
It is owned by the City or Municipal Highway Agency.