Road 225 over South Fork Willow Creek
GoodMadera County, California · 0.3 MI E of Road 274 · Structure no. 41C0022
- Built
- 1951
- 74 years old, rebuilt 1986
- Condition
- Good
- inspected September 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 2,200
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Road 225 over South Fork Willow Creek is a concrete continuous tee beam carrying Road 225 over South Fork Willow Creek in Madera County, California. It was built in 1951 and reconstructed in 1986, so it is 74 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,200 vehicles a day, roughly 7% of them trucks, projected to reach 2,744 by 2042. The structure is 102 ft (31.2 m) long and 44 ft wide. If it were closed, the detour would be 24.9 mi (40 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road 225 over South Fork Willow Creek built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1986.
What condition is Road 225 over South Fork Willow Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Road 225 over South Fork Willow Creek carry?
About 2,200 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Road 225 over South Fork Willow Creek?
The structure is 102 ft (31.2 m) long with a longest span of 40 ft (12.2 m) and a deck 44 ft wide.
Who owns Road 225 over South Fork Willow Creek?
It is owned by the County Highway Agency.