Santa Fe Blvd over Berenda Slough
PoorMadera County, California · 0.2 MI N/W of Ave 27 · Structure no. 41C0012
- Built
- 1968
- 57 years old
- Condition
- Poor
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 182 ft
- 6 main spans
- Daily traffic
- 259
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Santa Fe Blvd over Berenda Slough is a concrete continuous slab carrying Santa Fe Blvd over Berenda Slough in Madera County, California. It was built in 1968, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 259 vehicles a day, roughly 7% of them trucks, projected to reach 655 by 2041. The structure is 182 ft (55.5 m) long and 31 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Santa Fe Blvd over Berenda Slough built?
It was built in 1968, making it 57 years old in 2025.
What condition is Santa Fe Blvd over Berenda Slough in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2023.
How much traffic does Santa Fe Blvd over Berenda Slough carry?
About 259 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Santa Fe Blvd over Berenda Slough?
The structure is 182 ft (55.5 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.
Who owns Santa Fe Blvd over Berenda Slough?
It is owned by the County Highway Agency.