N Gateway DR over SR 99
FairMadera County, California · 06-MAD-099-12.75-MAD · Structure no. 41 0058
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 302 ft
- 3 main spans
- Daily traffic
- 4,000
- 1998 count
- Owner
- State
- State Highway Agency
About this bridge
N Gateway DR over SR 99 is a concrete continuous box beam or girders - multiple carrying N Gateway DR over SR 99 in Madera County, California. It was built in 1958, so it is 67 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,000 vehicles a day, roughly 10% of them trucks, projected to reach 6,542 by 2041. The structure is 302 ft (92 m) long and 35 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Gateway DR over SR 99 built?
It was built in 1958, making it 67 years old in 2025.
What condition is N Gateway DR over SR 99 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does N Gateway DR over SR 99 carry?
About 4,000 vehicles per day (1998 count), of which roughly 10% are trucks.
How long is N Gateway DR over SR 99?
The structure is 302 ft (92 m) long with a longest span of 97 ft (29.6 m) and a deck 35 ft wide.
Who owns N Gateway DR over SR 99?
It is owned by the State Highway Agency.