US Bridges

No Data Entered over Chiquito Creek

Good

Madera County, California · No Data Entered · Structure no. 051551000035978

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Slab
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
80
2022 count
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Chiquito Creek is a prestressed concrete slab carrying No Data Entered over Chiquito Creek in Madera County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 120 by 2045. The structure is 60 ft (18.3 m) long and 25 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesChiquito Creek
LocationNo Data Entered
RouteFederal Lands Road 5S00
Coordinates37.49439, -119.40626
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation*: *
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating—
Inventory rating—

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span59 ft (17.9 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2022)
Projected traffic120 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Chiquito Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is No Data Entered over Chiquito Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does No Data Entered over Chiquito Creek carry?

About 80 vehicles per day (2022 count).

How long is No Data Entered over Chiquito Creek?

The structure is 60 ft (18.3 m) long with a longest span of 59 ft (17.9 m) and a deck 25 ft wide.

Who owns No Data Entered over Chiquito Creek?

It is owned by the U.S. Forest Service.