Higuera ST over Ballona Creek
GoodLos Angeles County, California · 330 Ft W/O W. Jefferson B · Structure no. 53C2395
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 186 ft
- 1 main span
- Daily traffic
- 7,400
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Higuera ST over Ballona Creek is a prestressed concrete box beam or girders - single or spread carrying Higuera ST over Ballona Creek in Los Angeles County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,400 vehicles a day, roughly 1% of them trucks, projected to reach 8,900 by 2044. The structure is 186 ft (56.7 m) long and 70 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Higuera ST over Ballona Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Higuera ST over Ballona Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Higuera ST over Ballona Creek carry?
About 7,400 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Higuera ST over Ballona Creek?
The structure is 186 ft (56.7 m) long with a longest span of 183 ft (55.8 m) and a deck 70 ft wide.
Who owns Higuera ST over Ballona Creek?
It is owned by the City or Municipal Highway Agency.