US Bridges

Corral Canyon over Solstice Creek

Good

Los Angeles County, California · 974FT N/O Pac Cst HWY · Structure no. 53C2337

Built
2008
17 years old
Condition
Good
inspected June 2023
Type
Arch - Deck
Concrete
Length
30 ft
1 main span
Daily traffic
1,572
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Corral Canyon over Solstice Creek is a concrete arch - deck carrying Corral Canyon over Solstice Creek in Los Angeles County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,572 vehicles a day, roughly 2% of them trucks, projected to reach 1,729 by 2043. The structure is 30 ft (9 m) long and 42 ft wide. If it were closed, the detour would be 9.3 mi (15 km).

CarriesCorral Canyon
CrossesSolstice Creek
Location974FT N/O Pac Cst HWY
RouteCity Street 0
Coordinates34.03492, -118.74431
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length30 ft (9 m)
Longest span28 ft (8.5 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,572 (2014)
Projected traffic1,729 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.3 mi (15 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Corral Canyon over Solstice Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is Corral Canyon over Solstice Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Corral Canyon over Solstice Creek carry?

About 1,572 vehicles per day (2014 count), of which roughly 2% are trucks.

How long is Corral Canyon over Solstice Creek?

The structure is 30 ft (9 m) long with a longest span of 28 ft (8.5 m) and a deck 42 ft wide.

Who owns Corral Canyon over Solstice Creek?

It is owned by the City or Municipal Highway Agency.