US Bridges

Firestone Blvd N over Coyote Creek

Good

Los Angeles County, California · 0.9MI E/O Valley View Ave · Structure no. 53C2194

Built
2022
3 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete Continuous
Length
161 ft
3 main spans
Daily traffic
5,508
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Firestone Blvd N over Coyote Creek is a concrete continuous slab carrying Firestone Blvd N over Coyote Creek in Los Angeles County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,508 vehicles a day, roughly 7% of them trucks, projected to reach 6,334 by 2043. The structure is 161 ft (49 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFirestone Blvd N
CrossesCoyote Creek
Location0.9MI E/O Valley View Ave
RouteCity Street 0
Coordinates33.87767, -118.01567
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, precast panels
Main spans3 (+1 approach)
Design loadHL 93
Structure length161 ft (49 m)
Longest span44 ft (13.3 m)
Deck width44 ft (13.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,508 (2013)
Projected traffic6,334 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Firestone Blvd N over Coyote Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Firestone Blvd N over Coyote Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Firestone Blvd N over Coyote Creek carry?

About 5,508 vehicles per day (2013 count), of which roughly 7% are trucks.

How long is Firestone Blvd N over Coyote Creek?

The structure is 161 ft (49 m) long with a longest span of 44 ft (13.3 m) and a deck 44 ft wide.

Who owns Firestone Blvd N over Coyote Creek?

It is owned by the City or Municipal Highway Agency.