El Segundo Blvd over Acta
PoorLos Angeles County, California · 25FT E/O Alameda ST · Structure no. 53C2140
- Built
- 2000
- 25 years old
- Condition
- Poor
- inspected April 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 59 ft
- 1 main span
- Daily traffic
- 11,268
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
El Segundo Blvd over Acta is a prestressed concrete tee beam carrying El Segundo Blvd over Acta in Los Angeles County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 11,268 vehicles a day, roughly 24% of them trucks, projected to reach 12,958 by 2043. The structure is 59 ft (17.9 m) long and 130 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Segundo Blvd over Acta built?
It was built in 2000, making it 25 years old in 2025.
What condition is El Segundo Blvd over Acta in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2023.
How much traffic does El Segundo Blvd over Acta carry?
About 11,268 vehicles per day (2013 count), of which roughly 24% are trucks.
How long is El Segundo Blvd over Acta?
The structure is 59 ft (17.9 m) long with a longest span of 51 ft (15.5 m) and a deck 130 ft wide.
Who owns El Segundo Blvd over Acta?
It is owned by the City or Municipal Highway Agency.