US Bridges

El Segundo Blvd over Acta

Poor

Los Angeles County, California · 25FT E/O Alameda ST · Structure no. 53C2140

Built
2000
25 years old
Condition
Poor
inspected April 2023
Type
Tee Beam
Prestressed Concrete
Length
59 ft
1 main span
Daily traffic
11,268
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

El Segundo Blvd over Acta is a prestressed concrete tee beam carrying El Segundo Blvd over Acta in Los Angeles County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 11,268 vehicles a day, roughly 24% of them trucks, projected to reach 12,958 by 2043. The structure is 59 ft (17.9 m) long and 130 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesEl Segundo Blvd
CrossesActa
Location25FT E/O Alameda ST
RouteCity Street 7Q815
Coordinates33.91606, -118.2234
Functional classUrban Other Principal Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating44.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length59 ft (17.9 m)
Longest span51 ft (15.5 m)
Deck width130 ft (39.5 m)
Roadway width80 ft (24.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,268 (2013)
Projected traffic12,958 by 2043
Trucks24%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was El Segundo Blvd over Acta built?

It was built in 2000, making it 25 years old in 2025.

What condition is El Segundo Blvd over Acta in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2023.

How much traffic does El Segundo Blvd over Acta carry?

About 11,268 vehicles per day (2013 count), of which roughly 24% are trucks.

How long is El Segundo Blvd over Acta?

The structure is 59 ft (17.9 m) long with a longest span of 51 ft (15.5 m) and a deck 130 ft wide.

Who owns El Segundo Blvd over Acta?

It is owned by the City or Municipal Highway Agency.