US Bridges

Long Bch Blvd over Sdbi 130

Good

Los Angeles County, California · 0.2MI S/O Del Amo Blvd · Structure no. 53C2029

Built
1994
31 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
22,048
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Long Bch Blvd over Sdbi 130 is a concrete culvert carrying Long Bch Blvd over Sdbi 130 in Los Angeles County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,048 vehicles a day, roughly 1% of them trucks, projected to reach 26,458 by 2042. The structure is 31 ft (9.3 m) long and 100 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLong Bch Blvd
CrossesSdbi 130
Location0.2MI S/O Del Amo Blvd
RouteCity Street 0L061
Coordinates33.84228, -118.19205
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length31 ft (9.3 m)
Longest span14 ft (4.4 m)
Deck width100 ft (30.5 m)
Roadway width70 ft (21.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,048 (2015)
Projected traffic26,458 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Long Bch Blvd over Sdbi 130 built?

It was built in 1994, making it 31 years old in 2025.

What condition is Long Bch Blvd over Sdbi 130 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Long Bch Blvd over Sdbi 130 carry?

About 22,048 vehicles per day (2015 count), of which roughly 1% are trucks.

How long is Long Bch Blvd over Sdbi 130?

The structure is 31 ft (9.3 m) long with a longest span of 14 ft (4.4 m) and a deck 100 ft wide.

Who owns Long Bch Blvd over Sdbi 130?

It is owned by the City or Municipal Highway Agency.