Clark Ave over Del Amo Blvd Chan
GoodLos Angeles County, California · 50FT S/O Del Amo Blvd · Structure no. 53C2017
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected December 2024
- Type
- Slab
- Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 30,568
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Clark Ave over Del Amo Blvd Chan is a concrete slab carrying Clark Ave over Del Amo Blvd Chan in Los Angeles County, California. It was built in 1996, so it is 29 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30,568 vehicles a day, roughly 1% of them trucks, projected to reach 36,682 by 2044. The structure is 39 ft (11.9 m) long and 78 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clark Ave over Del Amo Blvd Chan built?
It was built in 1996, making it 29 years old in 2025.
What condition is Clark Ave over Del Amo Blvd Chan in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does Clark Ave over Del Amo Blvd Chan carry?
About 30,568 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is Clark Ave over Del Amo Blvd Chan?
The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 78 ft wide.
Who owns Clark Ave over Del Amo Blvd Chan?
It is owned by the City or Municipal Highway Agency.