US Bridges

Clark Ave over Del Amo Blvd Chan

Good

Los Angeles County, California · 50FT S/O Del Amo Blvd · Structure no. 53C2017

Built
1996
29 years old
Condition
Good
inspected December 2024
Type
Slab
Concrete
Length
39 ft
1 main span
Daily traffic
30,568
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Clark Ave over Del Amo Blvd Chan is a concrete slab carrying Clark Ave over Del Amo Blvd Chan in Los Angeles County, California. It was built in 1996, so it is 29 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,568 vehicles a day, roughly 1% of them trucks, projected to reach 36,682 by 2044. The structure is 39 ft (11.9 m) long and 78 ft wide.

CarriesClark Ave
CrossesDel Amo Blvd Chan
Location50FT S/O Del Amo Blvd
RouteCity Street 0L066
Coordinates33.84681, -118.13368
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length39 ft (11.9 m)
Longest span36 ft (11 m)
Deck width78 ft (23.8 m)
Roadway width64 ft (19.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,568 (2014)
Projected traffic36,682 by 2044
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Clark Ave over Del Amo Blvd Chan built?

It was built in 1996, making it 29 years old in 2025.

What condition is Clark Ave over Del Amo Blvd Chan in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Clark Ave over Del Amo Blvd Chan carry?

About 30,568 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Clark Ave over Del Amo Blvd Chan?

The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 78 ft wide.

Who owns Clark Ave over Del Amo Blvd Chan?

It is owned by the City or Municipal Highway Agency.