Gavina Ave over Pacoima Canyon Wash
FairLos Angeles County, California · 0.1 M E/O Tibbetts ST · Structure no. 53C1988
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 82 ft
- 1 main span
- Daily traffic
- 7,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Gavina Ave over Pacoima Canyon Wash is a steel stringer/multi-beam or girder carrying Gavina Ave over Pacoima Canyon Wash in Los Angeles County, California. It was built in 1990, so it is 35 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,500 vehicles a day, roughly 5% of them trucks, projected to reach 13,183 by 2042. The structure is 82 ft (25 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gavina Ave over Pacoima Canyon Wash built?
It was built in 1990, making it 35 years old in 2025.
What condition is Gavina Ave over Pacoima Canyon Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Gavina Ave over Pacoima Canyon Wash carry?
About 7,500 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Gavina Ave over Pacoima Canyon Wash?
The structure is 82 ft (25 m) long with a longest span of 80 ft (24.4 m) and a deck 53 ft wide.
Who owns Gavina Ave over Pacoima Canyon Wash?
It is owned by the City or Municipal Highway Agency.