Nordhoff Way over UP RR & Limekiln Chan
FairLos Angeles County, California · 0.3 M E/O Corbin Ave · Structure no. 53C1977
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected December 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 227 ft
- 2 main spans
- Daily traffic
- 28,500
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Nordhoff Way over UP RR & Limekiln Chan is a prestressed concrete continuous box beam or girders - multiple carrying Nordhoff Way over UP RR & Limekiln Chan in Los Angeles County, California. It was built in 1990, so it is 35 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 28,500 vehicles a day, roughly 5% of them trucks, projected to reach 54,338 by 2043. The structure is 227 ft (69.2 m) long and 91 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nordhoff Way over UP RR & Limekiln Chan built?
It was built in 1990, making it 35 years old in 2025.
What condition is Nordhoff Way over UP RR & Limekiln Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Nordhoff Way over UP RR & Limekiln Chan carry?
About 28,500 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Nordhoff Way over UP RR & Limekiln Chan?
The structure is 227 ft (69.2 m) long with a longest span of 114 ft (34.6 m) and a deck 91 ft wide.
Who owns Nordhoff Way over UP RR & Limekiln Chan?
It is owned by the City or Municipal Highway Agency.