Mcbean Parkway over Santa Clara Riv
GoodLos Angeles County, California · 0.5MI N/O Magic Mtn Pky · Structure no. 53C1840
- Built
- 1985
- 40 years old, rebuilt 1990
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 595 ft
- 7 main spans
- Daily traffic
- 61,500
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mcbean Parkway over Santa Clara Riv is a prestressed concrete stringer/multi-beam or girder carrying Mcbean Parkway over Santa Clara Riv in Los Angeles County, California. It was built in 1985 and reconstructed in 1990, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 61,500 vehicles a day, roughly 2% of them trucks, projected to reach 73,900 by 2044. The structure is 595 ft (181.4 m) long and 131 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mcbean Parkway over Santa Clara Riv built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 1990.
What condition is Mcbean Parkway over Santa Clara Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Mcbean Parkway over Santa Clara Riv carry?
About 61,500 vehicles per day (2014 count), of which roughly 2% are trucks.
How long is Mcbean Parkway over Santa Clara Riv?
The structure is 595 ft (181.4 m) long with a longest span of 84 ft (25.6 m) and a deck 131 ft wide.
Who owns Mcbean Parkway over Santa Clara Riv?
It is owned by the City or Municipal Highway Agency.