Fremont Ave over UPRR
PoorLos Angeles County, California · 50FT S/O Mission RD · Structure no. 53C1674
- Built
- 1979
- 46 years old
- Condition
- Poor
- inspected July 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 51,262
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fremont Ave over UPRR is a prestressed concrete slab carrying Fremont Ave over UPRR in Los Angeles County, California. It was built in 1979, so it is 46 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 51,262 vehicles a day, roughly 3% of them trucks, projected to reach 64,138 by 2041. The structure is 53 ft (16.2 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fremont Ave over UPRR built?
It was built in 1979, making it 46 years old in 2025.
What condition is Fremont Ave over UPRR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2023.
How much traffic does Fremont Ave over UPRR carry?
About 51,262 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Fremont Ave over UPRR?
The structure is 53 ft (16.2 m) long with a longest span of 48 ft (14.6 m) and a deck 84 ft wide.
Who owns Fremont Ave over UPRR?
It is owned by the City or Municipal Highway Agency.