US Bridges

Tournament RD over Pico Cyn Chan

Good

Los Angeles County, California · 0.3MI N/O Wiley Cyn RD · Structure no. 53C1554

Built
1973
52 years old
Condition
Good
inspected December 2021
Type
Tee Beam
Concrete
Length
78 ft
1 main span
Daily traffic
7,993
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tournament RD over Pico Cyn Chan is a concrete tee beam carrying Tournament RD over Pico Cyn Chan in Los Angeles County, California. It was built in 1973, so it is 52 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,993 vehicles a day, roughly 2% of them trucks, projected to reach 7,000 by 2042. The structure is 78 ft (23.8 m) long and 52 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTournament RD
CrossesPico Cyn Chan
Location0.3MI N/O Wiley Cyn RD
RouteCity Street 0QQ03
Coordinates34.38826, -118.55815
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating65.4 US tons
Inventory rating39.2 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length78 ft (23.8 m)
Longest span75 ft (22.9 m)
Deck width52 ft (15.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,993 (2014)
Projected traffic7,000 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tournament RD over Pico Cyn Chan built?

It was built in 1973, making it 52 years old in 2025.

What condition is Tournament RD over Pico Cyn Chan in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.

How much traffic does Tournament RD over Pico Cyn Chan carry?

About 7,993 vehicles per day (2014 count), of which roughly 2% are trucks.

How long is Tournament RD over Pico Cyn Chan?

The structure is 78 ft (23.8 m) long with a longest span of 75 ft (22.9 m) and a deck 52 ft wide.

Who owns Tournament RD over Pico Cyn Chan?

It is owned by the City or Municipal Highway Agency.