Greenleaf Blvd over Compton Crk
FairLos Angeles County, California · 0.1MI W/O Willowbrook Ave · Structure no. 53C1481
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 8,446
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greenleaf Blvd over Compton Crk is a concrete continuous slab carrying Greenleaf Blvd over Compton Crk in Los Angeles County, California. It was built in 1963, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,446 vehicles a day, roughly 3% of them trucks, projected to reach 9,713 by 2043. The structure is 80 ft (24.4 m) long and 67 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenleaf Blvd over Compton Crk built?
It was built in 1963, making it 62 years old in 2025.
What condition is Greenleaf Blvd over Compton Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Greenleaf Blvd over Compton Crk carry?
About 8,446 vehicles per day (2013 count), of which roughly 3% are trucks.
How long is Greenleaf Blvd over Compton Crk?
The structure is 80 ft (24.4 m) long with a longest span of 39 ft (11.9 m) and a deck 67 ft wide.
Who owns Greenleaf Blvd over Compton Crk?
It is owned by the City or Municipal Highway Agency.