US Bridges

135th ST over Dominguez Hollypark Chan

Fair

Los Angeles County, California · 200FT E/O Crenshaw Blvd · Structure no. 53C1458

Built
1961
64 years old
Condition
Fair
inspected July 2023
Type
Slab
Concrete Continuous
Length
110 ft
4 main spans
Daily traffic
11,615
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

135th ST over Dominguez Hollypark Chan is a concrete continuous slab carrying 135th ST over Dominguez Hollypark Chan in Los Angeles County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,615 vehicles a day, roughly 2% of them trucks, projected to reach 13,357 by 2043. The structure is 110 ft (33.5 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries135th ST
CrossesDominguez Hollypark Chan
Location200FT E/O Crenshaw Blvd
RouteCity Street 0L088
Coordinates33.9091, -118.32592
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length110 ft (33.5 m)
Longest span49 ft (14.9 m)
Deck width70 ft (21.2 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,615 (2013)
Projected traffic13,357 by 2043
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 135th ST over Dominguez Hollypark Chan built?

It was built in 1961, making it 64 years old in 2025.

What condition is 135th ST over Dominguez Hollypark Chan in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does 135th ST over Dominguez Hollypark Chan carry?

About 11,615 vehicles per day (2013 count), of which roughly 2% are trucks.

How long is 135th ST over Dominguez Hollypark Chan?

The structure is 110 ft (33.5 m) long with a longest span of 49 ft (14.9 m) and a deck 70 ft wide.

Who owns 135th ST over Dominguez Hollypark Chan?

It is owned by the City or Municipal Highway Agency.