Saticoy Street over Tujunga Wash
GoodLos Angeles County, California · 0.3 MI E/O Woodman Ave · Structure no. 53C1313
- Built
- 1952
- 73 years old, rebuilt 1975
- Condition
- Good
- inspected June 2022
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 76 ft
- 1 main span
- Daily traffic
- 26,680
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Saticoy Street over Tujunga Wash is a concrete box beam or girders - multiple carrying Saticoy Street over Tujunga Wash in Los Angeles County, California. It was built in 1952 and reconstructed in 1975, so it is 73 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 26,680 vehicles a day, roughly 2% of them trucks, projected to reach 31,640 by 2040. The structure is 76 ft (23.2 m) long and 83 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Saticoy Street over Tujunga Wash built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1975.
What condition is Saticoy Street over Tujunga Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.
How much traffic does Saticoy Street over Tujunga Wash carry?
About 26,680 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is Saticoy Street over Tujunga Wash?
The structure is 76 ft (23.2 m) long with a longest span of 70 ft (21.3 m) and a deck 83 ft wide.
Who owns Saticoy Street over Tujunga Wash?
It is owned by the City or Municipal Highway Agency.