US Bridges

Hope Street over Blocked Ped Access

Good

Los Angeles County, California · 75 S/O 3rd ST · Structure no. 53C1209

Built
1976
49 years old
Condition
Good
inspected August 2022
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
16,826
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hope Street over Blocked Ped Access is a concrete slab carrying Hope Street over Blocked Ped Access in Los Angeles County, California. It was built in 1976, so it is 49 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,826 vehicles a day, roughly 1% of them trucks, projected to reach 20,740 by 2040. The structure is 38 ft (11.6 m) long and 90 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHope Street
CrossesBlocked Ped Access
Location75 S/O 3rd ST
RouteCity Street 0
Coordinates34.05342, -118.25244
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span33 ft (10.1 m)
Deck width90 ft (27.3 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,826 (2018)
Projected traffic20,740 by 2040
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Hope Street over Blocked Ped Access built?

It was built in 1976, making it 49 years old in 2025.

What condition is Hope Street over Blocked Ped Access in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Hope Street over Blocked Ped Access carry?

About 16,826 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Hope Street over Blocked Ped Access?

The structure is 38 ft (11.6 m) long with a longest span of 33 ft (10.1 m) and a deck 90 ft wide.

Who owns Hope Street over Blocked Ped Access?

It is owned by the City or Municipal Highway Agency.