US Bridges

Burnside Ave over Ballona Creek

Good

Los Angeles County, California · At Cologne ST · Structure no. 53C1056

Built
1974
51 years old
Condition
Good
inspected June 2022
Type
Tee Beam
Concrete
Length
41 ft
1 main span
Daily traffic
550
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Burnside Ave over Ballona Creek is a concrete tee beam carrying Burnside Ave over Ballona Creek in Los Angeles County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, roughly 1% of them trucks, projected to reach 785 by 2042. The structure is 41 ft (12.5 m) long and 112 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBurnside Ave
CrossesBallona Creek
LocationAt Cologne ST
RouteCity Street 0
Coordinates34.04278, -118.35679
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating38.6 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length41 ft (12.5 m)
Longest span39 ft (11.9 m)
Deck width112 ft (34 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2018)
Projected traffic785 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Burnside Ave over Ballona Creek built?

It was built in 1974, making it 51 years old in 2025.

What condition is Burnside Ave over Ballona Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Burnside Ave over Ballona Creek carry?

About 550 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Burnside Ave over Ballona Creek?

The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 112 ft wide.

Who owns Burnside Ave over Ballona Creek?

It is owned by the City or Municipal Highway Agency.