Foothill Blvd over Pacoima Wash
FairLos Angeles County, California · 0.2 Mile SE Maclay ST · Structure no. 53C0958
- Built
- 1923
- 102 years old, rebuilt 1959
- Condition
- Fair
- inspected January 2024
- Type
- Arch - Deck
- Concrete
- Length
- 144 ft
- 2 main spans
- Daily traffic
- 19,441
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Foothill Blvd over Pacoima Wash is a concrete arch - deck carrying Foothill Blvd over Pacoima Wash in Los Angeles County, California. It was built in 1923 and reconstructed in 1959, so it is 102 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,441 vehicles a day, roughly 2% of them trucks, projected to reach 33,355 by 2046. The structure is 144 ft (43.9 m) long and 62 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Blvd over Pacoima Wash built?
It was built in 1923, making it 102 years old in 2025. It was reconstructed in 1959.
What condition is Foothill Blvd over Pacoima Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Foothill Blvd over Pacoima Wash carry?
About 19,441 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Foothill Blvd over Pacoima Wash?
The structure is 144 ft (43.9 m) long with a longest span of 70 ft (21.3 m) and a deck 62 ft wide.
Who owns Foothill Blvd over Pacoima Wash?
It is owned by the City or Municipal Highway Agency.