Centinela Ave over Centinela Crk
GoodLos Angeles County, California · 100FT S/O SR-90 Fwy · Structure no. 53C0778
- Built
- 1962
- 63 years old, rebuilt 2001
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 74 ft
- 1 main span
- Daily traffic
- 14,729
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Centinela Ave over Centinela Crk is a prestressed concrete box beam or girders - multiple carrying Centinela Ave over Centinela Crk in Los Angeles County, California. It was built in 1962 and reconstructed in 2001, so it is 63 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,729 vehicles a day, roughly 2% of them trucks, projected to reach 16,938 by 2044. The structure is 74 ft (22.5 m) long and 109 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Centinela Ave over Centinela Crk built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2001.
What condition is Centinela Ave over Centinela Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Centinela Ave over Centinela Crk carry?
About 14,729 vehicles per day (2014 count), of which roughly 2% are trucks.
How long is Centinela Ave over Centinela Crk?
The structure is 74 ft (22.5 m) long with a longest span of 70 ft (21.3 m) and a deck 109 ft wide.
Who owns Centinela Ave over Centinela Crk?
It is owned by the County Highway Agency.