Baranca Ave S over Big Dalton Wash
FairLos Angeles County, California · 0.3MI S/O I-10 Fwy · Structure no. 53C0672L
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 8,524
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Baranca Ave S over Big Dalton Wash is a concrete slab carrying Baranca Ave S over Big Dalton Wash in Los Angeles County, California. It was built in 1975, so it is 50 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,524 vehicles a day, roughly 2% of them trucks, projected to reach 9,803 by 2043. The structure is 39 ft (11.9 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baranca Ave S over Big Dalton Wash built?
It was built in 1975, making it 50 years old in 2025.
What condition is Baranca Ave S over Big Dalton Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Baranca Ave S over Big Dalton Wash carry?
About 8,524 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Baranca Ave S over Big Dalton Wash?
The structure is 39 ft (11.9 m) long with a longest span of 37 ft (11.3 m) and a deck 40 ft wide.
Who owns Baranca Ave S over Big Dalton Wash?
It is owned by the County Highway Agency.