Camino Real Ave over Santa Anita Wash
GoodLos Angeles County, California · 0.1MI W/O 10th Ave · Structure no. 53C0655
- Built
- 1957
- 68 years old
- Condition
- Good
- inspected May 2021
- Type
- Frame
- Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 3,510
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Camino Real Ave over Santa Anita Wash is a concrete frame carrying Camino Real Ave over Santa Anita Wash in Los Angeles County, California. It was built in 1957, so it is 68 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,510 vehicles a day, roughly 1% of them trucks, projected to reach 3,861 by 2041. The structure is 39 ft (11.9 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Camino Real Ave over Santa Anita Wash built?
It was built in 1957, making it 68 years old in 2025.
What condition is Camino Real Ave over Santa Anita Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2021.
How much traffic does Camino Real Ave over Santa Anita Wash carry?
About 3,510 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is Camino Real Ave over Santa Anita Wash?
The structure is 39 ft (11.9 m) long with a longest span of 35 ft (10.7 m) and a deck 47 ft wide.
Who owns Camino Real Ave over Santa Anita Wash?
It is owned by the City or Municipal Highway Agency.