Carson ST over Dominguez Chan
FairLos Angeles County, California · 0.1MI E/O I-405 Fwy · Structure no. 53C0645
- Built
- 1959
- 66 years old, rebuilt 1970
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 258 ft
- 4 main spans
- Daily traffic
- 15,600
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Carson ST over Dominguez Chan is a prestressed concrete stringer/multi-beam or girder carrying Carson ST over Dominguez Chan in Los Angeles County, California. It was built in 1959 and reconstructed in 1970, so it is 66 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,600 vehicles a day, roughly 4% of them trucks, projected to reach 18,700 by 2044. The structure is 258 ft (78.6 m) long and 96 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carson ST over Dominguez Chan built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1970.
What condition is Carson ST over Dominguez Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Carson ST over Dominguez Chan carry?
About 15,600 vehicles per day (2014 count), of which roughly 4% are trucks.
How long is Carson ST over Dominguez Chan?
The structure is 258 ft (78.6 m) long with a longest span of 63 ft (19.2 m) and a deck 96 ft wide.
Who owns Carson ST over Dominguez Chan?
It is owned by the City or Municipal Highway Agency.