US Bridges

Camino Real over Arcadia Wash

Good

Los Angeles County, California · 0.1MI E/O El Monte Ave · Structure no. 53C0636

Built
1955
70 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
4,692
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Camino Real over Arcadia Wash is a concrete slab carrying Camino Real over Arcadia Wash in Los Angeles County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,692 vehicles a day, roughly 1% of them trucks, projected to reach 5,161 by 2043. The structure is 38 ft (11.6 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCamino Real
CrossesArcadia Wash
Location0.1MI E/O El Monte Ave
RouteCity Street 0Q496
Coordinates34.12165, -118.03781
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.8 US tons
Inventory rating28.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span33 ft (10.1 m)
Deck width47 ft (14.3 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,692 (2013)
Projected traffic5,161 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Camino Real over Arcadia Wash built?

It was built in 1955, making it 70 years old in 2025.

What condition is Camino Real over Arcadia Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Camino Real over Arcadia Wash carry?

About 4,692 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is Camino Real over Arcadia Wash?

The structure is 38 ft (11.6 m) long with a longest span of 33 ft (10.1 m) and a deck 47 ft wide.

Who owns Camino Real over Arcadia Wash?

It is owned by the City or Municipal Highway Agency.