El Camino Colege M over Redondo Beach Blvd
FairLos Angeles County, California · 0.1MI W/O Crenshaw Blvd · Structure no. 53C0565
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 102 ft
- 1 main span
- Daily traffic
- 500
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
El Camino Colege M over Redondo Beach Blvd is a prestressed concrete box beam or girders - multiple carrying El Camino Colege M over Redondo Beach Blvd in Los Angeles County, California. It was built in 1978, so it is 47 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, projected to reach 600 by 2043. The structure is 102 ft (31.1 m) long and 108 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Camino Colege M over Redondo Beach Blvd built?
It was built in 1978, making it 47 years old in 2025.
What condition is El Camino Colege M over Redondo Beach Blvd in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does El Camino Colege M over Redondo Beach Blvd carry?
About 500 vehicles per day (2013 count).
How long is El Camino Colege M over Redondo Beach Blvd?
The structure is 102 ft (31.1 m) long with a longest span of 100 ft (30.5 m) and a deck 108 ft wide.
Who owns El Camino Colege M over Redondo Beach Blvd?
It is owned by the County Highway Agency.