Soledad Cyn RD over Nelson Cyn Wash
GoodLos Angeles County, California · 3MI E/O Agua Dulce Cyn RD · Structure no. 53C0487
- Built
- 1949
- 76 years old, rebuilt 1962
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 62 ft
- 3 main spans
- Daily traffic
- 2,550
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Soledad Cyn RD over Nelson Cyn Wash is a concrete continuous slab carrying Soledad Cyn RD over Nelson Cyn Wash in Los Angeles County, California. It was built in 1949 and reconstructed in 1962, so it is 76 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,550 vehicles a day, roughly 4% of them trucks, projected to reach 2,805 by 2043. The structure is 62 ft (18.9 m) long and 31 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Soledad Cyn RD over Nelson Cyn Wash built?
It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1962.
What condition is Soledad Cyn RD over Nelson Cyn Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Soledad Cyn RD over Nelson Cyn Wash carry?
About 2,550 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Soledad Cyn RD over Nelson Cyn Wash?
The structure is 62 ft (18.9 m) long with a longest span of 20 ft (6.1 m) and a deck 31 ft wide.
Who owns Soledad Cyn RD over Nelson Cyn Wash?
It is owned by the County Highway Agency.