Foothill Blvd over Santa Anita Wash
FairLos Angeles County, California · 0.2MI E/O Santa Anita Ave · Structure no. 53C0396
- Built
- 1928
- 97 years old
- Condition
- Fair
- inspected June 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 53 ft
- 2 main spans
- Daily traffic
- 27,242
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Foothill Blvd over Santa Anita Wash is a concrete continuous tee beam carrying Foothill Blvd over Santa Anita Wash in Los Angeles County, California. It was built in 1928, so it is 97 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,242 vehicles a day, roughly 2% of them trucks, projected to reach 32,690 by 2043. The structure is 53 ft (16.2 m) long and 102 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Blvd over Santa Anita Wash built?
It was built in 1928, making it 97 years old in 2025.
What condition is Foothill Blvd over Santa Anita Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Foothill Blvd over Santa Anita Wash carry?
About 27,242 vehicles per day (2013 count), of which roughly 2% are trucks.
How long is Foothill Blvd over Santa Anita Wash?
The structure is 53 ft (16.2 m) long with a longest span of 26 ft (7.9 m) and a deck 102 ft wide.
Who owns Foothill Blvd over Santa Anita Wash?
It is owned by the City or Municipal Highway Agency.